POST-CONSTRUCTION EXCELLENCE

ZERO-DEFECT
HANDOVERS

Engineered turnover cleaning for commercial GCs who cannot afford punch-list callbacks. Rigorous containment, certified OSHA supervisors, and clinical handovers on critical-path schedules.

  • 100% Punch-List Clearance Guarantee Prior to Owner Walkthrough
  • OSHA 30 Certified Supervisors on Every Active Commercial Site
  • Rapid Response Crews Scaled for Tight Milestone Deadlines

GUARANTEED 24-HOUR SITE SCOPING · FULL CERTIFICATE OF INSURANCE · BONDED

0%
ON-TIME TURNOVER
0M+ SQ FT
COMMERCIAL HANDOVERS
0 DEFECTS
PUNCH-LIST COMMITMENT

STANDARDIZED PROTOCOL // ZERO DEFECT TARGET

THE THREE-STAGE CLEAN

Our phased scope of work systematically eliminates construction debris, airborne silica, and surface residue across three locked-in milestones to guarantee architect-ready handover.

01
Rough Clean Debris & Bulk Removal
02
Final Clean Glass & Surface Detailing
03
Touch-Up Clean White-Glove Handover

STAGE 01 // SUBSTRUCTURE CLEAR

ROUGH CLEAN

Heavy construction site debris removal and drywall scrap cleanup

Conducted immediately after electrical, plumbing, and drywall trades finish. We extract bulk hazardous materials, sweep studs, and prep subfloors for flooring installation.

  • Bulk framing debris & packaging haul-off
  • Drywall mud scraping & stud-bay vacuuming
  • Pre-flooring concrete slab deep sweep
  • HVAC rough intake duct perimeter clearing

STAGE 02 // ARCHITECTURAL INTENSIVE

FINAL CLEAN

Squeegee detailing of commercial windows and fine cabinetry wiping

The core transformation pass. Every vertical, horizontal, and concealed surface is degreased, de-dusted, and stripped of paint overspray, caulking residue, and protective adhesives.

  • Inside/out millwork, cabinetry & drawer track wipe
  • Streak-free architectural window & frame scraping
  • Appliance factory film & sticker extraction
  • Sanitary ceramic tile grout haze neutralization

STAGE 03 // HANDOVER CERTIFIED

TOUCH-UP CLEAN

White glove detail polishing of luxury brass and chrome fixtures

Scheduled 24 to 48 hours prior to architect or client walkthrough. Clears settling airborne dust, punch-list trade footprints, and micro-smudges on chrome and mirrors.

  • HVAC settled micro-dust dry-trap wiping
  • Smudge neutralization on high-finish chrome & brass
  • Final hardwood & stone polish with edge detailing
  • Punch-list touch-up footprint eradication

VERIFIED ARCHITECTURAL SPECIFICATION

INDUSTRIAL GRIT TO
SHOWROOM FINISH

Drag the central inspection slider to audit the shift from caustic drywall dust, tape residue, and adhesive haze to clinical, scratch-free perfection ready for homeowner walkthrough.

PHASE 01: CONTAMINANTS

Micro-fine gypsum haze, protective film gum, and HVAC duct fallout.

CRITICAL RISK: Abrasive drywall particles scratch bespoke matte black lacquer and low-E glazing if dry-wiped.

Showroom handover condition with polished surfaces and zero drywall dust
POLISHED // ZERO RESIDUE
Raw construction site covered in gypsum drywall dust, adhesive stickers, and construction debris
DRYWALL MUD // ACTIVE SITE
SURFACE AUDIT: ARCHITECTURAL CABINETRY & LOW-E GLAZING TOLERANCE: 100% HEPA EXTRACTED

PHASE 03: HANDOVER

Streak-free optical clarity, conditioned wood joints, and sanitized fixtures.

DELIVERY METRIC: Guaranteed passing on first white-glove inspection with zero punch-list surface demerits.

OSHA-30 COMPLIANT

100% field crew certification in crystalline silica containment and airborne particulate protocols.

$5M GENERAL LIABILITY

Comprehensive commercial policy, active inland marine rider, and workers' comp coverage on all active sites.

BONDED & ACCREDITED

Surety bonded delivery assuring zero substrate scratching, etched architectural glass, or punch-list delays.

48-Hour Scope Turnaround // Zero Punch-List Guarantee

SPECIFICATION SHEET // RISK MITIGATION

METRICS YOU CAN
BUILD ON

Engineered compliance frameworks and verified site delivery records designed to eliminate owner liability on multi-phase commercial construction handovers.

0%
ON-TIME HANDOVERS
$0M
LIABILITY INSURANCE
0
SAFETY INCIDENTS
0+
SITES CLEARED

FIELD-VERIFIED SUPERINTENDENT LOGS

TRUSTED BY
SITE SUPERS

Direct field feedback from General Contractors and Site Superintendents managing high-stakes commercial turnovers with zero margin for delays.

★ ★ ★ ★ ★

On a 140,000 sq ft medical buildout, our mechanical trades ran 48 hours behind schedule right against client turnover. ApexBuild mobilized night shifts without a single complaint, phased containment around active drywall tapers, and handed over spotless, inspection-ready corridors at 0600. Zero punch-list callbacks.

Marcus Vance
Marcus Vance
Senior Site Superintendent, Turner-Vance Commercial
★ ★ ★ ★ ★

Most post-construction cleaners require babysitting and still leave slurry in window sills and grit under baseboards. ApexBuild runs their own safety tailgates, coordinates directly with our mechanical foremen, and executes autonomously. They protect finishes and hit turnover deadlines without taking up superintendent bandwidth.

David Kowalski
David Kowalski
Project Executive, Kowalski General Contracting
★ ★ ★ ★ ★

We had four specialty trades overlapping in the main atrium 24 hours before owner walkthrough. ApexBuild stepped in, phased high-bay vacuuming and terrazzo polish without stalling architectural millwork crews, and delivered showroom quality on an impossible deadline. They are the only cleaning sub we trust.

Ray Ortiz
Ray Ortiz
General Superintendent, Ironclad Industrial Construction

EXPEDITED BID DESK // 24-HR DISPATCH

SUBMIT YOUR
SCOPE

Post-construction handovers allow zero margin for project delays. Submit architectural floor plans, specification sheets, or lock in an immediate walkthrough with our field estimating team.

  • 24-Hour Guaranteed Turnaround on itemized Division 01 bids
  • Emergency Site Hotline: (800) 555-APEX (Active Jobsite Priority)
  • Fully bonded, licensed, and OSHA 30 supervisor on every deck

FIELD RESPONSE PROMISE: Our senior project superintendent reviews all scopes within 2 hours of receipt to ensure compliant manpower scheduling.

WORK ORDER INTAKE // SPEC-DOC 2026
FAST-TRACK DESK
Required Cleaning Phases (Select All Applicable)
SPEC DISPATCHED // SENIOR ESTIMATOR ASSIGNED. RESPONSE WITHIN 2 HOURS.